Show me the decision.
Show me the working.

The cargo makes money. The cash does not arrive in time. Now what?

Open the report. Follow the cash. Change a condition. See exactly what the decision owner receives.

An LNG cargo, trade evidence and battery commitments brought together in one decision pack
COMMERCIAL CHOICEOPERATING EVIDENCEDECISION AN OWNER CAN USE
Start with the decision already on the desk

A report should change what you can do next.

A green dashboard does not tell Treasury which payment it can fund. A successful import does not tell Finance whether it can close. A full battery does not tell the trader which commitment it can honour.

IMPLEMENTARY works through the commercial and operating evidence behind those choices. The output is a usable decision: the options still open, the condition that changes the answer, the action an owner can approve, and the evidence another person can reproduce.

01 / PARALLEL

The profitable cargo with a funding gap

A $1m trading margin conceals a $1m facility shortfall. See the terms change that restores a $0.5m buffer.

Inspect the cash ledger
02 / IMPLEMENTARY

The release that needs a smaller boundary

A normal quantity correction exposes a $28,500 invoice difference. See the replay, the control and the release decision.

Inspect the acceptance pack
03 / PARALLEL

The battery offer that cannot be delivered

Twenty MWh looks sufficient until the first hour needs 11 MW. See the feasible offer and the revenue given up.

Inspect the commitment map
01 / PARALLEL / Decision pack CARGO-01

The trade works.
The payment week does not.

LNG cargo commitments linked to a settlement bridge, with an earlier receipt closing the funding gap
01 / CARGO FUNDINGChange the terms. Preserve the trade. Restore the buffer.
“We have a million dollars of margin. Why are we asking for more funding?”THE WORKED BUYING SITUATION

The desk is considering a 1,000,000 MMBtu contractual gas cargo allocation. The all-in supplier payment is $10m. The customer owes $11m. Treasury has $11m of drawable capacity in the paying entity.

The initial request is to approve the trade. The decision becomes more specific when we put the supplier payment, collateral call and customer receipt on the same dated ledger. On day 8, the required draw reaches $12m. Profit does not settle that payment.

The useful job is to agree terms the entity can fund before commitment. A larger facility is one route. A customer advance is another. They need the same cash ledger and a clear commercial cost.

C01 / Decision comparisonUSD / same physical allocation / day 0 approval
$12.000mOriginal peak required funding
$10.500mPeak with agreed advance
$0.500mRemaining drawable buffer
Decision measureOriginal termsCustomer advanceLarger facility
Cash capacity$11.000m$11.000m$13.000m
Customer advance$0$1.550m on day 0$0
Concession / arrangement fee$0$50,000$75,000
Peak required draw$12.000m$10.500m$12.075m
Minimum headroom-$1.000m$0.500m$0.925m
Financing at 7% p.a.$30,493$26,514$30,781
Modelled contribution after fees and finance$969,507$923,486$894,219
Funding decisionCannot commit on these termsMeets $0.5m buffer, subject to receiptMeets buffer, subject to signed facility

Original terms exceed the $11m facility. Their contribution uses the same 7% funding rate for comparison; the route requires additional capacity before commitment. Contribution is before tax and overheads.

Conditional decision

Negotiate a $1.55m advance and a $50,000 concession. Commit only after the advance has cleared and Treasury confirms $11m is drawable by the paying entity. This preserves the cargo allocation and the required $0.5m buffer. If either condition fails, return to the funding choice.

What changed

A smaller commercial change beats an unfunded approval.

The customer pays $1.55m earlier and $9.45m at settlement. That is the same $11m sale, not an extra receipt. After the $50,000 concession, the advance removes $1.5m from the peak draw.

The modelled contribution is $923,486. The larger-facility route produces $894,219 under its assumed fee and rate. The difference is $29,267; it is an option comparison, not an achieved saving.

What we stop doing

Stop using lifetime margin as permission to pay.

Keep the actual delivery obligation and the entity funding boundary. Remove the assumption that a profitable contract is automatically financeable. Do not count a promised advance, group cash or an unsigned facility as available money.

The recommendation also has a limit. It leaves no headroom above the required buffer. A larger collateral call changes the answer immediately.

C02 / Dated funding profileRequired draw / before interest settlement on day 21
Original funding peaks at $12m. A cleared advance reduces the peak to $10.5m, preserving a $0.5m buffer inside the $11m facility.
Cash eventOriginal cash flowAdvance route cash flowAdvance route cumulative cash
D0: advance less concession$0+$1,500,000+$1,500,000
D1: all-in supplier payment-$10,000,000-$10,000,000-$8,500,000
D8: collateral-$2,000,000-$2,000,000-$10,500,000
D15: customer balance+$11,000,000+$9,450,000-$1,050,000
D20: collateral return+$2,000,000+$2,000,000+$950,000
D21: financing paid-$30,493-$26,514+$923,486

Opening cash is zero. The facility is separate from cash receipts. Collateral returns in full and does not create profit. Supplier cost includes the allocated delivery costs. All settlements are USD in one entity; the example excludes FX, tax and hedge P&L.

C03 / Change the conditionTest the funding condition

Would you still approve it?

Move the advance or increase collateral. The original commitment and the $11m facility stay in the model.

$1.55m
$10.500mPeak required funding
$0.500mMinimum drawable headroom
$923,486Contribution after fees and finance

Meets the $0.5m buffer. Confirm cleared funds and drawability before commitment.

A positive advance carries the fixed $50,000 concession. Interest accrues daily at 7% on the required closing draw and is paid on day 21. Same-day receipts must be cleared before payments.

C04 / Challenge and decision recordOwner actions are part of the output
Challenge to agreed advancePeak drawHeadroomDecision consequence
Collateral rises by $0.5m$11.000m$0.000mBuffer is consumed; increase advance to $2.05m or reopen funding.
Advance arrives on day 9$12.050m-$1.050mEarlier breach remains; do not treat late cash as a cure.
Customer pays on day 22$10.500m$0.500mPeak unchanged; financing increases to $38,836. Check credit and delivery effects.
Revised advance for higher collateral$10.500m$0.500mBuffer restored under the higher collateral assumption.
Decision record fieldPopulated instruction
AuthorityCommercial owner agrees the concession; Treasury confirms the entity facility; delegated approver authorises commitment.
Evidence before approvalSigned sale variation, cleared advance, facility availability and settlement calendar.
Trigger to reopenCollateral above $2m, advance not cleared by commitment, receipt date changes, or another trade consumes the facility.
AcceptanceA second analyst reproduces the $10.5m peak and the $0.5m minimum headroom from the cash ledger.
What remains openCounterparty acceptance, credit limit and actual hedge/physical exposures require the client’s own evidence.
02 / IMPLEMENTARY / Decision pack RELEASE-01

The import passed.
The next event did not.

A weighed copper shipment, a corrected trade record and reconciled ledgers with a duplicate held aside
02 / RELEASE ACCEPTANCEMake the ordinary correction the test that earns approval.
“Everything loaded. Can we approve the release?”THE WORKED BUYING SITUATION

The team has reconciled the opening book. The decision is whether the intended first release can handle the business that follows it. We use a fixed-price refined copper sale, an ordinary quantity correction and a duplicate message to make that question observable.

The useful job is a bounded release decision with an operable exception route. A feature checklist or another green migration total will not show whether the invoice and ledger still agree after the correction.

Follow the quantity change into the invoice and receivable. Then send the duplicate and the late version. A release earns acceptance when the same economic result survives each event.

R01 / Trade-to-cash evidence bridgeDEMO-CU-014 / USD / fixed $9,500 per tonne
995 tonnes and $9,452,500 become 992 tonnes and $9,424,000 through a linked $28,500 credit note.
Business recordBefore correctionRequired final state
Contract quantity1,000 t1,000 t
Delivered quantity995 t992 t
Remaining delivery obligation5 t8 t
Invoice / receivable$9,452,500$9,424,000
Ledger correctionNoneDebit revenue adjustment $28,500; credit receivable $28,500
TraceMovement v1Movement v2 linked to v1 and the credit note

This bridge isolates the sale, receivable and revenue adjustment. Inventory cost, hedging, taxes and purchase accounting are outside the fixture. The 8 t remain an obligation; they have not disappeared because the invoice changed.

R02 / Acceptance matrixFour isolated failure cases / do not add the differences together
TestFailure to exposeEconomic differenceRequired evidence after repair
Q01 Quantity correction995 t; AR $9,452,500$28,500 excess receivable; 3 t992 t; AR $9,424,000
D01 Duplicate invoice eventTwo balances; $18,848,000$9,424,000 duplicate receivableOne balance; $9,424,000
V01 Late movement v1Reverts to 995 t3 t; $28,500 valuation basisv1 rejected; v2 retained at 992 t
L01 Ledger acknowledgement failsMarked complete; GL $9,452,500$28,500 AR-to-GL differenceHold; replay credit note once; GL $9,424,000

Extend the same acceptance method across the release scope: products, volumes, entities, security roles, integrations and recovery requirements.

Bounded release decision

Keep automatic amendment posting out of the first release until Q01, D01, V01 and L01 pass with retained evidence. Permit a controlled first-release boundary only if Operations and Finance accept a two-person check for every in-scope movement. Any ledger mismatch stays open; it cannot be counted as a completed close item.

The event replay that earns the green status

ArrivalExpected economic result
MOV-014 v1995 t; invoice $9,452,500
MOV-014 v2992 t; net receivable $9,424,000
Duplicate v2No change; duplicate recorded
Late v1No change; superseded version rejected

Each accepted version replaces the movement quantity. It does not add another movement. A replay of the same backlog ends at the same quantity and receivable.

Price the temporary operating boundary

Control inputPopulated assumption
Daily in-scope movements16
Two-person review effort6 combined person-minutes per movement
Allocated review capacity120 person-minutes per day
Daily workload / ceiling96 minutes / 20 movements
Ten-day control cost$1,440 at $90 per person-hour
Targeted repair estimate$7,200: 8 person-days at $900
Modelled temporary route$8,640 before software or supplier charges
R03 / Approval boundary and exitSmaller scope is a decision, not a hidden workaround
FieldInstruction the operating team receives
Turn off for first releaseUnattended amendment posting and automatic “complete” status when the ledger has not acknowledged the correction.
Keep visibleThe corrected quantity, linked credit note, original invoice, event version and unresolved ledger exception.
Temporary ownerOperations checks movement identity and version; Finance reconciles the invoice and ledger; release sponsor owns the scope boundary.
Stop / escalateMore than 20 movements in a day, missing checker, unresolved material difference or review effort above 120 person-minutes.
Exit after ten business daysAll four tests pass, backlog replay is idempotent, first-close reconciliation is reproduced, and the operating owner signs off. If not, renew explicitly or defer.
Decision alternativesFull automation after evidenced repair; bounded release with the priced control; defer until the business can operate the scope.
03 / PARALLEL / Decision pack BESS-01

The energy balances.
The promises do not.

A battery installation and two dispatch paths with one excess block removed to protect reserve
03 / BATTERY COMMITMENTSSell the shape the asset can deliver. Keep the reserve.
“There is 20 MWh in the battery. Why can’t we sell the extra eight?”THE WORKED BUYING SITUATION

The battery has 10 MW of export capability and 20 MWh of usable AC-deliverable energy above its hard operating floor at 18:00. A firm sale already requires 6 MW in each of the next two hours. The proposed overlay is 5 MW followed by 3 MW.

Across the two hours, 12 MWh plus 8 MWh equals 20 MWh. In the first hour, however, the commitments add to 11 MW. Moving one MWh into the second hour solves the power conflict but still leaves no energy against the desk’s 1 MWh end reserve.

The useful job is to price the offer that can actually be delivered while protecting the existing sale. The original proposal is a comparison, not available revenue.

B01 / Commitment mapOne-hour blocks / no recharge in the window
The 5/3 MW overlay breaches power and reserve. A 4/4 shape still breaches reserve. The 4/3 offer meets both limits.
MeasureProposed overlayShift one MWhReserve-protected offer
Additional MW by hour5 / 34 / 44 / 3
Total export MW by hour11 / 910 / 1010 / 9
Total delivered energy20 MWh20 MWh19 MWh
Ending usable energy0 MWh0 MWh1 MWh
Power limit satisfied?NoYesYes
1 MWh end reserve satisfied?NoNoYes
B02 / Offer economicsAUD / incremental to the existing firm sale
7 MWhAdditional sale that fits both limits
A$1,160Modelled incremental contribution
1 MWhUsable energy retained at 20:00
Incremental economicsProposed 5 / 3Shifted 4 / 4Accepted 4 / 3
Gross revenue at A$300 / A$150 per MWhA$1,950A$1,800A$1,650
Energy and cycling cost at A$70 per MWhA$560A$560A$490
ContributionA$1,390A$1,240A$1,160
Executable under these constraintsNoNoYes, subject to acceptance

The executable offer forgoes A$300 of first-hour revenue and A$70 of variable cost compared with the impossible proposal: A$230 less indicated contribution. It preserves the firm 6 MW sale in both hours and the 1 MWh reserve.

The comparison uses A$300 / A$150 per MWh and A$70 per MWh of variable cost. Usable energy is defined on the AC export basis after discharge losses and the hard floor; the separate 1 MWh reserve is additional. No recharge, ancillary-service reservation, ramp constraint or outage is modelled. The existing firm sale’s revenue and costs are unchanged and excluded from the incremental comparison.

Conditional decision

Offer 4 MW from 18:00 to 19:00 and 3 MW from 19:00 to 20:00. Do not commit the extra first-hour MW. The recommendation depends on both product volumes being divisible and the buyer accepting the revised shape.

B03 / Dispatch instruction and reopening triggersCommercial owner + dispatch owner
Decision fieldPopulated instruction
Before commitmentConfirm 20 MWh usable AC energy, 10 MW export availability, the existing 6 / 6 MW sale and acceptance of the 4 / 3 MW overlay.
Dispatch instructionHour 1: export 10 MW, leaving 10 MWh. Hour 2: export 9 MW, leaving the 1 MWh reserve.
If starting energy is 19 MWhReduce overlay to 4 / 2 MW to preserve the reserve; incremental contribution becomes A$1,080 at the same prices and costs.
If available export falls to 9 MWReduce first-hour overlay to 3 MW; 3 / 3 MW delivers 18 MWh and leaves 2 MWh; incremental contribution A$930.
If the buyer requires all eight MWhReject or renegotiate the proposal. Shifting the hour does not restore the reserve.
AcceptanceThe dispatch owner reproduces the hourly power and energy balance and confirms no other commitment has reserved the same capacity.
How the work reaches a decision

The customer receives the working,
not just the conclusion.

Bring the choice that is waiting, the date it matters and the records behind it. We work with your trading, risk, Treasury, Operations and technology owners to make the recommendation inspectable.

01 / DEFINE THE JOB

What has to change?

Agree the struggling moment, decision deadline and authority. In CARGO-01, the job is to fund the payment week while retaining the trade.

02 / RECONSTRUCT

Show the actual obligation.

Retain the starting book and reconcile dates, quantities, versions and entity limits. Expose the exception that the summary conceals.

03 / CHALLENGE

Compare feasible routes.

Change the smallest meaningful lever. Test cash timing, operating capacity or dispatch shape. Price what the change gives up.

04 / HAND OVER

Make it usable by the owner.

Deliver the populated report, source bridge, conditions, actions and reopening triggers. Require a second person to reproduce the result.

Two ways we help trading businesses decide

IMPLEMENTARY

ETRM / CTRM advisory

Choose a system, a release boundary or a recovery route using trading events and operating evidence. The customer sees representative trades, expected results, observed differences, control costs and an acceptance decision.

PARALLEL

Decision modelling

Compare a live commodity or energy trading choice against its existing obligations. The customer sees dated cash, physical constraints, alternative economics and the precise condition that changes the recommendation.

Scope and fees follow the decision and the evidence needed to resolve it. Client references are available privately where appropriate.

Inspect the evidence

Take the report apart.

Take the decision reports and supporting tables into your own review. Follow the cash ledger, inspect the acceptance cases and compare the dispatch commitments.

Where the examples come from

These examples extend Implementary’s existing work on dated cargo funding, trading-event acceptance, migration, decision records and battery obligations. The cargo case adds financing, a paid concession, an explicit cash buffer and reopening tests. The release case adds a populated copper trade and deterministic event replay. The battery case adds the reserve constraint and the economics of the executable offer.

How to read the calculations

Cargo funding is the maximum negative cumulative cash balance. Interest uses the required end-of-day draw, 7% actual/365 and no interest on positive cash; payment occurs after the final modelled settlement. Facility breach is reported even when the model continues the contractual cash flows. The minimum headroom policy is $500,000. The release replay accepts a newer event version once, ignores a duplicate and rejects a superseded version. The battery calculation uses one-hour energy blocks with AC-deliverable energy already net of discharge losses.

Start with one consequential choice

Which decision is waiting
for evidence like this?

A funding condition. A release boundary. A commitment the desk is about to make.

Bring the decision date, the options still open and the records you already trust.

Explore a worked decision with us