A PARALLEL DECISION IN PRACTICE

A bigger LNG business.
A better-funded decision.

Would you commit USD 600 million to expansion, or choose a smaller partnership that can withstand the cash demands of a stressed market?

Hypothetical business case · All financial figures in USD
Saved calculations · 16 October 2026
Public presentation refreshed · 19 October 2026

THE DECISION IN THREE MOVES

Return is only the first test.

A bigger trading business needs a return, funding that arrives on time, and credit exposure it can accept.

  1. 01

    Reject the original full expansion.

    Positive present value cannot cover a funding shortfall. The original USD 600m proposal runs short under the combined stress.

    USD 352.03mstressed funding shortfall
  2. 02

    Restructure around a partnership.

    A smaller sponsor share, customer prepayments and cost pass-through change the funding demands. The initial partnership still fails the credit limit.

    40%sponsor share of a 1 Mtpa venture
  3. 03

    Make credit protection a condition.

    Eligible bank support brings unsecured exposure below the limit. Its cost is included in the final recommendation.

    USD 19.50munsecured exposure against a USD 25m limit
01 / VALUE

Both proposals show positive value.

Base net present value · USD million

Original full expansion2 Mtpa / USD 600m funding envelope
96.57
Final protected partnership0.4 Mtpa sponsor share / USD 150m funding envelope
34.49
055110

The larger proposal has more assumed value. Funding determines whether it can be pursued as structured.

02 / FUNDING

Only one remains funded in every supplied stress.

Lowest available funding headroom · USD million

Original full expansion / USD 600m
-352.03
Final protected partnership / USD 150m
57.34
−4000 / funding limit100

The final partnership stays above its required funding threshold in the specified tests. This is not a guarantee against every market event.

Comparison basis: the original full proposal uses run 01 and USD 600m funding. The protected partnership uses run 03 and USD 150m funding. These are different commercial structures and funding packages. Present value is pre-tax at an assumed 12% annual hurdle over 66 months.

The decision is conditional. Confirm executable contracts, committed funding and qualifying bank support before commitment.

Discuss your decision ↗

THE CONDITION THAT CHANGES THE ANSWER

A cash pass is not
a credit approval.

The unprotected partnership offers USD 35.28m of base present value. But peak unsecured receivables exceed the USD 25m limit.

Eligible USD 20m bank protection reduces unsecured exposure to USD 19.50m. The annual fee lowers base present value to USD 34.49m. Protection is not an additional source of operating cash.

03 / CREDIT

Protection brings exposure inside the limit.

Peak stressed unsecured receivables · USD million

Limit: USD 25m
Without qualifying protectionFails the unsecured-receivables limit
39.50
With qualifying protectionPasses if the bank instrument qualifies
19.50
025 / limit50
39.50Gross exposure−20.00Eligible support=19.50Unsecured exposure

Proposed, not issued. Assumes enforceability, an eligible bank and no sponsor cash collateral. Without qualifying support, the tested recommendation becomes no expansion.

WHAT MUST BE TRUE

The structure matters as much as the size.

These assumptions support the partnership case. They require evidence before a real commitment.

90%

Cost pass-through

Contracted partner sales pass through supply and logistics costs, with an assumed USD 0.95/MMBtu service margin. The remaining 10% is market-linked.

70%

Customer prepayment

Customers prepay 70% of the contracted 90% of sales. A separate stress removes prepayments for six months and delays collection.

60%

Partner-funded share

The partner finances its own share. The sponsor must have enforceable limits on recourse and must not guarantee the whole venture.

USD 20m

Eligible bank support

Assumed fee: USD 200,000 per year. Cash collateral, different bank terms or weaker enforceability require a fresh funding and credit review.

What the USD 150m request means

USD 50mSponsor cash+USD 100mCommitted revolver=USD 150mFunding envelope

USD 12m setup spending is a use of this funding, not an additional USD 150m investment. A USD 25m minimum cash reserve remains binding. Bank credit protection does not increase this envelope.

EXPLORE THE SAVED EVIDENCE

Every saved decision stays visible.

Executive Leadership Report ↓

Select a review to see its original result. Earlier recommendations are retained as historical findings, not current approvals. Financial values are USD millions.

01 / USD 600m funding review

The full expansion fails the cash test. The smaller partnership is preferred within the initial envelope. Credit protection was not yet a binding constraint in this historical run.

Retain current business

Within configured limits Current-position comparison.

Base present value
0.00
Lowest tested present value
0.00
Minimum funding headroom
575.00

Full LNG expansion - 2 Mtpa

Fails configured limits Breaches funding requirements.

Base present value
96.57
Lowest tested present value
-79.38
Minimum funding headroom
-352.03

Partner-funded position - 0.4 Mtpa sponsor share

Preferred, conditional Approval remains subject to the stated conditions.

Base present value
27.16
Lowest tested present value
20.15
Minimum funding headroom
506.78
All amounts in USD millions · saved 16 October 2026
AlternativeBase NPVWorst tested NPVMinimum funding headroomAssessment
Retain current business0.000.00575.00Within limits
Full LNG expansion - 2 Mtpa96.57−79.38−352.03Fails limits
Partner-funded position - 0.4 Mtpa sponsor share27.1620.15506.78Preferred, conditional

Saved 2026-10-16T08:03:17.684Z · Results are retained as calculated; this page does not recalculate them.

02 / USD 150m partner review

The smaller funding package passes the specified cash stresses. This is an intermediate result: the subsequent receivables check identifies an unsecured credit-limit breach.

Retain current business

Within configured limits Current-position comparison.

Base present value
0.00
Lowest tested present value
0.00
Minimum funding headroom
125.00

Full LNG expansion - 2 Mtpa

Fails configured limits Breaches funding requirements.

Base present value
99.06
Lowest tested present value
-62.19
Minimum funding headroom
-787.81

Partner-funded position - 0.4 Mtpa sponsor share

Preferred, conditional Approval remains subject to the stated conditions.

Base present value
35.28
Lowest tested present value
27.33
Minimum funding headroom
57.55
All amounts in USD millions · saved 16 October 2026
AlternativeBase NPVWorst tested NPVMinimum funding headroomAssessment
Retain current business0.000.00125.00Within limits
Full LNG expansion - 2 Mtpa99.06−62.19−787.81Fails limits
Partner-funded position - 0.4 Mtpa sponsor share35.2827.3357.55Preferred, conditional

Saved 2026-10-16T08:05:45.287Z · Results are retained as calculated; this page does not recalculate them.

03 / Credit-supported recommendation

The USD 25m unsecured-receivables limit is now binding. Only the credit-supported partnership and the no-expansion baseline clear all configured limits. Approval remains conditional.

Retain current business

Within configured limits Current-position comparison.

Base present value
0.00
Lowest tested present value
0.00
Minimum funding headroom
125.00

Full LNG expansion - 2 Mtpa

Fails configured limits Breaches funding requirements.

Base present value
99.06
Lowest tested present value
-62.19
Minimum funding headroom
-787.81

Partner-funded position - 0.4 Mtpa sponsor share

Fails configured limits Exceeds the unsecured-receivables limit.

Base present value
35.28
Lowest tested present value
27.33
Minimum funding headroom
57.55

Partner position with USD 20m bank credit support

Preferred, conditional Approval remains subject to the stated conditions.

Base present value
34.49
Lowest tested present value
26.53
Minimum funding headroom
57.34
All amounts in USD millions · saved 16 October 2026
AlternativeBase NPVWorst tested NPVMinimum funding headroomAssessment
Retain current business0.000.00125.00Within limits
Full LNG expansion - 2 Mtpa99.06−62.19−787.81Fails limits
Partner-funded position - 0.4 Mtpa sponsor share35.2827.3357.55Fails limits
Partner position with USD 20m bank credit support34.4926.5357.34Preferred, conditional

Saved 2026-10-16T08:10:40.144Z · Results are retained as calculated; this page does not recalculate them.

How to read these results

NPV is net present value at the assumed 12% annual pre-tax hurdle over 66 months. Available funding headroom includes available cash and undrawn committed funding after the USD 25m minimum cash reserve. A negative value signals a funding shortfall.

Worst NPV and minimum headroom are the weakest outcomes across the configured scenarios and need not occur in the same scenario. Figures for options that fail funding are indicative: those paths cannot be executed as proposed without further support.

The first two runs did not make the later receivables finding a binding limit. The funding envelope and commitment fees also changed between runs 01 and 02; this explains why present values and funding headroom differ. Their historical recommendations remain visible. The third run includes that limit and is the final recommendation shown here.

CHALLENGE THE RECOMMENDATION

Six stresses.
Funding still available.

The final protected partnership retains positive funding headroom across all six specified stresses. The combined event creates the tightest point.

These are defined challenges, not calibrated probabilities. Lowest present value and lowest funding headroom need not occur in the same scenario.

Read the full public review ↓
FINAL PARTNERSHIP / USD 150m ENVELOPE

Lowest funding headroom by stress

USD million above the required reserve

Margin spike
79.59
Spread squeeze
93.42
Terminal disruption
87.45
Buyer default
88.72
Combined event
57.34
Lost prepayments
60.54
0 / funding limit50100
Read the six stress definitions

CHALLENGE THE PROPOSAL

Six stresses, connected to the cash path.

01

Margin spike

JKM +USD 15 and Henry Hub +USD 5 for six months; margin receipts lag payments.

02

Spread squeeze

Two years of weaker trading spreads challenge the return from fixed commitments.

03

Terminal disruption

Reduced delivery capacity while committed supply and logistics costs continue.

04

Buyer default

Lost or delayed receipts expose the cash and credit consequences of customer failure.

05

Combined event

Concurrent shocks test whether the business can meet obligations under compound pressure.

06

Lost prepayments

Six months without prepayments and 30 extra days to collect customer cash.

These are defined challenges, not calibrated probabilities or a guarantee against every possible market event.

Inspect the commercial assumptions and pricing basis

WHAT WENT INTO THE CASE

Commercial inputs.
Dated cash.
Explicit limits.

All prices and terms below are assumptions for this demonstration. They are not live market quotations or executable offers.

Download the assumption register ↓
Contract period / valuation
5 years / 66 months, including final settlements
Assumed delivered LNG price
USD 11.25 per MMBtu
Assumed supply price
115% × USD 4.25 Henry Hub + USD 3.00 toll per loaded MMBtu
Partnership / sponsor economics
1 Mtpa gross / 40% sponsor share, equivalent to 0.4 Mtpa
Final funding / reserve
USD 50m cash + USD 100m committed revolver / USD 25m minimum cash
Funding costs
6.5% annual borrowing; 0.5% annual fee on the committed line
Setup capital / bank support
USD 12m / USD 20m credit support at USD 200,000 a year

SEE THE DECISION DEVELOP

From the first question
to a conditional recommendation.

12 min 51 sec · Silent · English subtitles

Follow the configuration, the funding challenge and the credit correction. Historical calculations are retained; the reporting presentation is refreshed for this edition.

Configuration and saved calculations: 16 October 2026. Reporting presentation: 19 October 2026. English subtitles are visible in the picture. No audio narration. Complete working files remain private.

Explore all 42 configuration and decision steps

FROM BUSINESS QUESTION TO EXECUTIVE REVIEW

Inspect the full configuration journey.

42 steps / configuration, reasoning and saved results

STEP 01 / 42

Start from the saved decision library

We start a new hypothetical LNG business case. Existing saved decisions remain untouched. All figures in this demonstration are assumptions in US dollars.

Open full-size screenshot ↗
Start from the saved decision library
Actual saved demonstration screen · 01 of 42

STEP 02 / 42

Choose a blank decision

A blank decision keeps the business question separate from existing trading books. We will compare no expansion, full ownership and a smaller partnership.

Open full-size screenshot ↗
Choose a blank decision
Actual saved demonstration screen · 02 of 42

STEP 03 / 42

Empty manual setup

We define the decision before importing any numbers. Business case is the correct decision type because this compares capital, contractual commitments and funding alternatives.

Open full-size screenshot ↗
Empty manual setup
Actual saved demonstration screen · 03 of 42

STEP 04 / 42

Set the business question

We ask whether the proposed funding is enough under stress, not simply whether LNG trading is profitable. The accountable owner is the Head of Trading.

Open full-size screenshot ↗
Set the business question
Actual saved demonstration screen · 04 of 42

STEP 05 / 42

Define valuation and limits

We use a 66-month horizon: five contract years plus final cash settlements. The assumed hurdle is 12% before tax. Setup capital is capped at $50m; the funding envelope is a separate cash constraint.

Open full-size screenshot ↗
Define valuation and limits
Actual saved demonstration screen · 05 of 42

STEP 06 / 42

Build the USD 600m funding envelope

The initial envelope is $100m opening cash plus a committed $500m revolver. Borrowing costs 6.5% a year and we preserve a $25m minimum cash reserve. Emergency group funding is excluded.

Open full-size screenshot ↗
Build the USD 600m funding envelope
Actual saved demonstration screen · 06 of 42

STEP 07 / 42

Import the prepared cargo dataset

We bring in the prepared scenario inputs: 140 full-scale cargoes, 70 partnership cargoes, six stress paths, supply payments, vessel costs, terminal commitments and separate margin movements. These are assumed inputs for this demonstration.

Open full-size screenshot ↗
Import the prepared cargo dataset
Actual saved demonstration screen · 07 of 42

STEP 08 / 42

Imported inputs validated

PARALLEL validates the imported data before calculation. The cash schedule preserves each payment date and distinguishes trading costs, setup spending and refundable collateral.

Open full-size screenshot ↗
Imported inputs validated
Actual saved demonstration screen · 08 of 42

STEP 09 / 42

Keep evidence and assumptions distinct

Commercial prices and contract terms are explicitly hypothetical. Cheniere supports the fixed-toll plus Henry Hub structure; BIS supports testing hedge-related liquidity shocks. Neither source supplies a live quotation for this case.

Open full-size screenshot ↗
Keep evidence and assumptions distinct
Actual saved demonstration screen · 09 of 42

STEP 10 / 42

Review the three business resources

The resource list separates wholly owned trading, the sponsor share of the partnership, and the facility fee. Each alternative receives only its own cargo schedule, avoiding double-counted volumes or funding.

Open full-size screenshot ↗
Review the three business resources
Actual saved demonstration screen · 10 of 42

STEP 11 / 42

Inspect full-scale commitments

The full option lifts 2 Mtpa: 28 cargoes each year. Four vessels support a 45-day round trip, using about 86% of available vessel-days. Setup costs $35m; supply tolls, charters and terminal fees remain payable during disruption.

Open full-size screenshot ↗
Inspect full-scale commitments
Actual saved demonstration screen · 11 of 42

STEP 12 / 42

Inspect the margin stress path

The stress raises JKM by $15 and Henry Hub by $5 for six months. Short-JKM margin is posted first; the Henry Hub margin receipt arrives five days later. Collateral is cash tied up, not a trading expense.

Open full-size screenshot ↗
Inspect the margin stress path
Actual saved demonstration screen · 12 of 42

STEP 13 / 42

Inspect the partner structure

The partnership trades 1 Mtpa gross; our sponsor owns 40%, equivalent to 0.4 Mtpa. Two vessels serve the venture. Cash flows include only our share, with $12m setup cost and no assumed guarantee of the partner share.

Open full-size screenshot ↗
Inspect the partner structure
Actual saved demonstration screen · 13 of 42

STEP 14 / 42

Challenge the customer prepayment assumption

Normally 90% of partner sales pass through supply and logistics costs, and customers prepay 70% of that contracted portion. We also test six months without prepayments and 30 days of extra collection delay.

Open full-size screenshot ↗
Challenge the customer prepayment assumption
Actual saved demonstration screen · 14 of 42

STEP 15 / 42

Allocate each alternative

The baseline adds no commitments. The full option owns all LNG economics. The partner option receives only its 40% share and requires enforceable limits on sponsor recourse. Both expansion options include the facility fee.

Open full-size screenshot ↗
Allocate each alternative
Actual saved demonstration screen · 15 of 42

STEP 16 / 42

Avoid double-counting the partner share

The partner cash schedule already contains the 40% sponsor economics. We allocate 100% of that prepared schedule, rather than applying 40% again. Rights remain unconfirmed because the terms are hypothetical.

Open full-size screenshot ↗
Avoid double-counting the partner share
Actual saved demonstration screen · 16 of 42

STEP 17 / 42

Review the complete stress set

We test a margin spike, a two-year spread squeeze, terminal disruption, buyer default, a combined event and lost customer prepayments. These are challenges to the proposal, not estimates of event probabilities.

Open full-size screenshot ↗
Review the complete stress set
Actual saved demonstration screen · 17 of 42

STEP 18 / 42

Check the selling price and units

The base delivered LNG benchmark is assumed at $11.25 per MMBtu. We distinguish delivered energy from loaded energy: 1.5% is lost through boil-off. Prices here describe the imported schedule; changing them requires rebuilding that schedule.

Open full-size screenshot ↗
Check the selling price and units
Actual saved demonstration screen · 18 of 42

STEP 19 / 42

Check indexed supply costs

Henry Hub is assumed at $4.25 per MMBtu. Supply costs 115% of Henry Hub plus a $3 fixed toll per loaded MMBtu. Keeping the purchase and selling benchmarks separate exposes basis and spread risk.

Open full-size screenshot ↗
Check indexed supply costs
Actual saved demonstration screen · 19 of 42

STEP 20 / 42

Set the liquidity risk control

Funding is checked for the sponsor entity. It must pay its bills and preserve USD 25m cash without group rescue. The early-review trigger is USD 50m of available funding headroom: cash plus unused committed borrowing, less the minimum cash reserve.

Open full-size screenshot ↗
Set the liquidity risk control
Actual saved demonstration screen · 20 of 42

STEP 21 / 42

Validate before calculation

The configuration check tests dates, linked resources, required stress schedules and collateral reconciliation. It prevents missing or duplicated inputs; it does not turn assumed commercial terms into signed contracts.

Open full-size screenshot ↗
Validate before calculation
Actual saved demonstration screen · 21 of 42

STEP 22 / 42

First saved result: profitability is not enough

The original USD 600m review shows USD 96.57m of base present value for full expansion. But its lowest available funding headroom is negative USD 352.03m. Positive value does not make this structure affordable under the specified stress.

Open full-size screenshot ↗
First saved result: profitability is not enough
Business explanation of the saved result · 19 October 2026 · 22 of 42

STEP 23 / 42

Compare all three alternatives

This saved review includes no expansion, full ownership and the partnership. We reject a higher apparent return when its funding limit fails. Value calculated after a cash breach is indicative because that path requires additional support.

Open full-size screenshot ↗
Compare all three alternatives
Business explanation of the saved result · 19 October 2026 · 23 of 42

STEP 24 / 42

Find the first emergency-cash date

Full expansion first breaches its funding limit on 1 March 2027. Its largest shortfall is USD 352.03m in the combined stress, despite the USD 600m envelope. That is why the original structure is not recommended for approval.

Open full-size screenshot ↗
Find the first emergency-cash date
Business explanation of the saved result · 19 October 2026 · 24 of 42

STEP 25 / 42

Preserve the first saved result

The first result remains a dated, separate saved record. A later report can change its presentation without replacing the underlying calculation. The public review presents selected evidence; complete calculations and schedules remain private.

Open full-size screenshot ↗
Preserve the first saved result
Current report presentation of the saved result · 19 October 2026 · 25 of 42

STEP 26 / 42

Create a smaller funding snapshot

We preserve the $600m result and change the working decision for a smaller board request. The new name clearly identifies the $150m partner funding review; the five-year cargo assumptions stay comparable.

Open full-size screenshot ↗
Create a smaller funding snapshot
Actual saved demonstration screen · 26 of 42

STEP 27 / 42

Configure a USD 150m partner envelope

The smaller request uses $50m of sponsor cash plus a $100m committed revolver. We keep the same $25m minimum cash reserve and 6.5% borrowing rate. The partner finances its own 60% share outside this sponsor account.

Open full-size screenshot ↗
Configure a USD 150m partner envelope
Actual saved demonstration screen · 27 of 42

STEP 28 / 42

Reprice the commitment fee

Reducing the facility also reduces its commitment fee. We replace the 66 monthly fee payments with $41,666.67 each: 0.50% a year on the $100m line. This prevents the revised case carrying the cost of the old $500m facility.

Open full-size screenshot ↗
Reprice the commitment fee
Actual saved demonstration screen · 28 of 42

STEP 29 / 42

Validate the revised funding case

The revised fee table is applied and the configuration passes again. Trading volumes, stress cash flows and hedge terms are unchanged. Only the sponsor funding package, its fees and the decision name have changed.

Open full-size screenshot ↗
Validate the revised funding case
Actual saved demonstration screen · 29 of 42

STEP 30 / 42

The smaller case clears the funding test

The intermediate USD 150m funding case shows USD 35.28m base present value, USD 12m setup spending and USD 57.55m lowest available funding headroom. It passes the tested cash constraints, but the binding credit review is still to follow.

Open full-size screenshot ↗
The smaller case clears the funding test
Business explanation of the saved result · 19 October 2026 · 30 of 42

STEP 31 / 42

Read the worst partner stress

In this intermediate run, the combined stress leaves USD 27.33m present value and USD 57.55m available funding headroom. Peak borrowing is USD 42.45m on the USD 100m revolver. This does not establish protection against every possible event.

Open full-size screenshot ↗
Read the worst partner stress
Business explanation of the saved result · 19 October 2026 · 31 of 42

STEP 32 / 42

Trace cash rather than relying on a headline

Available funding headroom is not the cash balance. It includes unused committed borrowing after the required cash reserve. The dated cash checks keep receipts, payments, loan balances and refundable margin separate so that debt is not mistaken for profit.

Open full-size screenshot ↗
Trace cash rather than relying on a headline
Business explanation of the saved result · 19 October 2026 · 32 of 42

STEP 33 / 42

Keep the intermediate result separate

The intermediate funding result remains separate from the original USD 600m review. Its public summary is selected evidence, not a complete operating model. Internal assumptions, complete cash schedules and configuration files remain private.

Open full-size screenshot ↗
Keep the intermediate result separate
Current report presentation of the saved result · 19 October 2026 · 33 of 42

STEP 34 / 42

Separate funding from setup spending

An executive review separates economic value, setup spending and funding. The USD 150m envelope is USD 50m cash plus a USD 100m committed line. The USD 12m setup cost is a use of that funding, not an additional USD 150m investment.

Open full-size screenshot ↗
Separate funding from setup spending
Business explanation of the saved result · 19 October 2026 · 34 of 42

STEP 35 / 42

Explain what could still change the answer

The partnership relies on enforceable cost pass-through, customer prepayments, committed partner capital and limits on sponsor recourse. We test the loss of prepayments, but these protections still require commercial and legal confirmation before commitment.

Open full-size screenshot ↗
Explain what could still change the answer
Business explanation of the saved result · 19 October 2026 · 35 of 42

STEP 36 / 42

Keep both earlier results searchable

The library retains both the original $600m result and the smaller $150m cash review. A subsequent credit check found a further issue, so neither historical result will be overwritten.

Open full-size screenshot ↗
Keep both earlier results searchable
Actual saved demonstration screen · 36 of 42

STEP 37 / 42

Bring in the separate credit findings

A separate invoice ledger check finds $39.50m peak partner receivables against a $25m limit. We import that binding limit and add a new option with $20m of eligible bank credit support at an assumed $200,000 annual fee.

Open full-size screenshot ↗
Bring in the separate credit findings
Actual saved demonstration screen · 37 of 42

STEP 38 / 42

Make the credit limit binding

The $25m unsecured-receivables limit is now an explicit portfolio constraint, using the maximum across all supplied stresses. The unprotected partner case fails. Proposed $20m bank support reduces the protected exposure to $19.50m.

Open full-size screenshot ↗
Make the credit limit binding
Actual saved demonstration screen · 38 of 42

STEP 39 / 42

Final recommendation after the credit check

The final credit-supported partnership is preferred. It shows USD 34.49m base present value and USD 57.34m lowest available funding headroom. The credit-support fee reduces value by about USD 0.79m; the unsecured partnership fails the credit limit.

Open full-size screenshot ↗
Final recommendation after the credit check
Current report presentation of the saved result · 19 October 2026 · 39 of 42

STEP 40 / 42

Final stress result and approval conditions

The final structure retains USD 26.53m present value in the combined stress and uses up to USD 42.66m of the USD 100m revolver. Credit support must be enforceable, bank-eligible and issued without sponsor cash collateral. These remain conditions to approval.

Open full-size screenshot ↗
Final stress result and approval conditions
Current report presentation of the saved result · 19 October 2026 · 40 of 42

STEP 41 / 42

Retain the full decision history

All three saved runs remain identifiable: the original USD 600m review, the USD 150m cash review and the final credit-supported recommendation. The revised answer is visible. The original inputs and results are not overwritten.

Open full-size screenshot ↗
Retain the full decision history
Business explanation of the saved result · 19 October 2026 · 41 of 42

STEP 42 / 42

The conditional approval request

Seek conditional approval for the USD 150m credit-supported partnership. The conditions are committed funding, partner capital, executable supply and logistics terms, enforceable cost recovery and eligible credit support. Change any of these and recalculate before commitment.

Open full-size screenshot ↗
The conditional approval request
Business explanation of the saved result · 19 October 2026 · 42 of 42

CHECK THE EVIDENCE

Evidence you can challenge.

459 / 459reconciliation checks17 / 17functional tests

The original demonstration reconciled the calculation outputs to a separate checking implementation and tested invalid inputs, funding breaches, credit protection and saved-result reproduction. These recorded tests passed on 16 October 2026; they do not constitute independent external commercial validation.

View the 17 functional tests, expected results and actual outcomes
Recorded demonstration test results · 16 October 2026
TestExpected resultActual outcomeResult
Change a stress without updating its cash scheduleReject incomplete updateReject incomplete updatePass
Omit a required stress scheduleReject incomplete configurationReject incomplete configurationPass
Release margin that was never depositedReject fictitious cash releaseReject fictitious cash releasePass
Start with borrowing above the committed lineReject borrowing above the lineReject borrowing above the linePass
Provide two no-expansion baselinesReject ambiguous baselineReject ambiguous baselinePass
Enter the same setup spending twiceReject duplicated spendingReject duplicated spendingPass
Offer higher NPV but insufficient cashPrefer the smaller partnershipPrefer the smaller partnershipPass
Calculate the no-expansion baselineUSD 0 incremental NPVUSD 0 incremental NPVPass
Calculate the final credit-supported casePrefer the credit-supported partnershipPrefer the credit-supported partnershipPass
Offer the unsecured partner case with higher NPVReject: unsecured credit limit breachedReject: unsecured credit limit breachedPass
Test the protected case against all configured limitsPass configured limitsPass configured limitsPass
Remove eligibility of bank credit supportRecommend retaining the current businessRecommend retaining the current businessPass
Reduce the revolver to USD 40mRecommend retaining the current businessRecommend retaining the current businessPass
Recalculate the four final alternative valuesReproduce all four saved NPVs to the centReproduce all four saved NPVs to the centPass
Charge the annual credit-support feeFive annual charges, once per contract yearFive annual charges, once per contract yearPass
Treat bank protection as additional cashNo additional cash recovery creditedNo additional cash recovery creditedPass
Test maximum protected receivables against USD 25mPass: USD 19.50m, below USD 25mPass: USD 19.50m, below USD 25mPass

The downloadable summary covers all 17 recorded functional tests in business language. Complete calculation schedules and regression evidence are retained privately for scoped evaluation. These historical checks have not been rerun for this publication update.

BEFORE A COMMITMENT

The recommendation has conditions.

The preferred option clears the specified model limits. It still requires evidence that the proposed structure can be delivered.

  1. Contracts that can be executed. Confirm matched supply, shipping and terminal rights, deliverability and the assumed commercial terms.
  2. Funding that is committed. Confirm the revolver, the partner’s 60% capital contribution and enforceable limits on sponsor recourse.
  3. Credit support that qualifies. Secure eligible USD 20m bank protection at the assumed fee, without sponsor cash collateral.
  4. A fresh decision if terms change. Replace assumptions with approved inputs and recalculate before signing.
Read all 20 conditions retained with the final result
  • Hypothetical demonstration: all commercial figures assumed in USD. No client validation, executable terms or calibrated event probabilities.
  • Pre-tax NPV at assumed 12% hurdle; tax domicile, legal covenants and post-tax equity returns require a separate mandate.
  • No emergency group cash included. Partnership succeeds only if 60% partner funding, pass-through, prepayment and capped recourse are enforceable.
  • Credit and delivery require invoice-level evidence. A cash-only view does not establish delivery performance or credit clearance.
  • Collateral is excluded from profit but included in cash and financing interest. No terminal franchise value or cash beyond contractual runoff assumed.
  • The final review makes the largest stressed unsecured receivables exposure a binding limit, using a separate invoice reconstruction. Bank support remains proposed, not issued.
  • Execute matched supply, charter and terminal terms; confirm deliverability and sanctions screening.
  • Obtain committed financing and collateral/netting legal opinions before signing five-year obligations.
  • Replace assumed quotes and pre-tax hurdle with approved prices, tax basis and board risk limits.
  • Execute non-recourse partner structure, committed 60% partner funding and prepayment rights; reject uncapped sponsor guarantees.
  • Obtain enforceable USD 20m eligible bank credit support, confirmed 1% fee and no sponsor cash collateral. If unavailable, do not commit: both unprotected expansion routes breach the credit limit.
  • Confirm rights and executable terms for Partner position with USD 20m bank credit support
  • Exploration uses reference data or authored assumptions. Replace and reconcile material inputs before a business commitment.
  • Review invoice timing and delivery obligations alongside cash results. Full supporting schedules are retained privately for controlled evaluation.
  • Deterministic authored stress paths, not calibrated probabilities or executable quotes.
  • Daily closing cash may understate intraday liquidity; gross margin call and five-day settlement mismatch explicitly stressed.
  • Pre-tax, no optional cargo optimisation, legal netting or quantitative vessel routing assurance.
  • Conservative commitment fee on the entire committed facility at 0.50% per year, paid monthly for the full 66-month horizon. Borrowing interest is calculated separately each day by PARALLEL.
  • No bank-protection recovery benefit is counted in cash or NPV. Protection reduces unsecured receivables exposure, with eligible issuing-bank exposure capped separately at USD 20m.
  • Supplied commercial cash schedules are assessed as prepared. Changes to prices, contract terms or stresses require refreshed schedules and a new calculation; untested outcomes are not inferred.

TAKE THE EVIDENCE WITH YOU

An executive view.
A reviewable case.

The public Executive Leadership Report brings the recommendation, visual comparisons, assumptions and decision history together.

Use the supporting tables to challenge the findings. The cash extract is illustrative and incomplete; it cannot reproduce the model.

Full configurations, complete cash schedules and internal validation files remain private. No client information is included in this hypothetical example.

YOUR NEXT CONSEQUENTIAL DECISION

Bring the decision.
We will work through the evidence.

Start with your business question, decision date and the options under consideration. A scoped Decision Case engagement can take agreed inputs through to a reviewable recommendation.

Discuss your decision ↗Compare the three service offerings ↗hello@implementary.tech

Use Implementary's existing enquiry form. Share the question first; agree a controlled exchange before sending sensitive documents.

PARALLELBY IMPLEMENTARY

© 2026 Implementary · Hypothetical LNG case
Saved results: 16 October 2026 / Public edition: 19 October 2026