A PARALLEL DECISION IN PRACTICE
A bigger LNG business.
A better-funded decision.
Would you commit USD 600 million to expansion, or choose a smaller partnership that can withstand the cash demands of a stressed market?
Hypothetical business case · All financial figures in USD
Saved calculations · 16 October 2026
Public presentation refreshed · 19 October 2026
THE DECISION IN THREE MOVES
Return is only the first test.
A bigger trading business needs a return, funding that arrives on time, and credit exposure it can accept.
- 01USD 352.03mstressed funding shortfall
Reject the original full expansion.
Positive present value cannot cover a funding shortfall. The original USD 600m proposal runs short under the combined stress.
- 0240%sponsor share of a 1 Mtpa venture
Restructure around a partnership.
A smaller sponsor share, customer prepayments and cost pass-through change the funding demands. The initial partnership still fails the credit limit.
- 03USD 19.50munsecured exposure against a USD 25m limit
Make credit protection a condition.
Eligible bank support brings unsecured exposure below the limit. Its cost is included in the final recommendation.
Both proposals show positive value.
Base net present value · USD million
The larger proposal has more assumed value. Funding determines whether it can be pursued as structured.
Only one remains funded in every supplied stress.
Lowest available funding headroom · USD million
The final partnership stays above its required funding threshold in the specified tests. This is not a guarantee against every market event.
Comparison basis: the original full proposal uses run 01 and USD 600m funding. The protected partnership uses run 03 and USD 150m funding. These are different commercial structures and funding packages. Present value is pre-tax at an assumed 12% annual hurdle over 66 months.
The decision is conditional. Confirm executable contracts, committed funding and qualifying bank support before commitment.
Discuss your decision ↗THE CONDITION THAT CHANGES THE ANSWER
A cash pass is not
a credit approval.
The unprotected partnership offers USD 35.28m of base present value. But peak unsecured receivables exceed the USD 25m limit.
Eligible USD 20m bank protection reduces unsecured exposure to USD 19.50m. The annual fee lowers base present value to USD 34.49m. Protection is not an additional source of operating cash.
Protection brings exposure inside the limit.
Peak stressed unsecured receivables · USD million
Proposed, not issued. Assumes enforceability, an eligible bank and no sponsor cash collateral. Without qualifying support, the tested recommendation becomes no expansion.
WHAT MUST BE TRUE
The structure matters as much as the size.
These assumptions support the partnership case. They require evidence before a real commitment.
Cost pass-through
Contracted partner sales pass through supply and logistics costs, with an assumed USD 0.95/MMBtu service margin. The remaining 10% is market-linked.
Customer prepayment
Customers prepay 70% of the contracted 90% of sales. A separate stress removes prepayments for six months and delays collection.
Partner-funded share
The partner finances its own share. The sponsor must have enforceable limits on recourse and must not guarantee the whole venture.
Eligible bank support
Assumed fee: USD 200,000 per year. Cash collateral, different bank terms or weaker enforceability require a fresh funding and credit review.
What the USD 150m request means
USD 12m setup spending is a use of this funding, not an additional USD 150m investment. A USD 25m minimum cash reserve remains binding. Bank credit protection does not increase this envelope.
EXPLORE THE SAVED EVIDENCE
Every saved decision stays visible.
Select a review to see its original result. Earlier recommendations are retained as historical findings, not current approvals. Financial values are USD millions.
01 / USD 600m funding review
The full expansion fails the cash test. The smaller partnership is preferred within the initial envelope. Credit protection was not yet a binding constraint in this historical run.
Retain current business
Within configured limits Current-position comparison.
- Base present value
- 0.00
- Lowest tested present value
- 0.00
- Minimum funding headroom
- 575.00
Full LNG expansion - 2 Mtpa
Fails configured limits Breaches funding requirements.
- Base present value
- 96.57
- Lowest tested present value
- -79.38
- Minimum funding headroom
- -352.03
Partner-funded position - 0.4 Mtpa sponsor share
Preferred, conditional Approval remains subject to the stated conditions.
- Base present value
- 27.16
- Lowest tested present value
- 20.15
- Minimum funding headroom
- 506.78
| Alternative | Base NPV | Worst tested NPV | Minimum funding headroom | Assessment |
|---|---|---|---|---|
| Retain current business | 0.00 | 0.00 | 575.00 | Within limits |
| Full LNG expansion - 2 Mtpa | 96.57 | −79.38 | −352.03 | Fails limits |
| Partner-funded position - 0.4 Mtpa sponsor share | 27.16 | 20.15 | 506.78 | Preferred, conditional |
Saved 2026-10-16T08:03:17.684Z · Results are retained as calculated; this page does not recalculate them.
02 / USD 150m partner review
The smaller funding package passes the specified cash stresses. This is an intermediate result: the subsequent receivables check identifies an unsecured credit-limit breach.
Retain current business
Within configured limits Current-position comparison.
- Base present value
- 0.00
- Lowest tested present value
- 0.00
- Minimum funding headroom
- 125.00
Full LNG expansion - 2 Mtpa
Fails configured limits Breaches funding requirements.
- Base present value
- 99.06
- Lowest tested present value
- -62.19
- Minimum funding headroom
- -787.81
Partner-funded position - 0.4 Mtpa sponsor share
Preferred, conditional Approval remains subject to the stated conditions.
- Base present value
- 35.28
- Lowest tested present value
- 27.33
- Minimum funding headroom
- 57.55
| Alternative | Base NPV | Worst tested NPV | Minimum funding headroom | Assessment |
|---|---|---|---|---|
| Retain current business | 0.00 | 0.00 | 125.00 | Within limits |
| Full LNG expansion - 2 Mtpa | 99.06 | −62.19 | −787.81 | Fails limits |
| Partner-funded position - 0.4 Mtpa sponsor share | 35.28 | 27.33 | 57.55 | Preferred, conditional |
Saved 2026-10-16T08:05:45.287Z · Results are retained as calculated; this page does not recalculate them.
03 / Credit-supported recommendation
The USD 25m unsecured-receivables limit is now binding. Only the credit-supported partnership and the no-expansion baseline clear all configured limits. Approval remains conditional.
Retain current business
Within configured limits Current-position comparison.
- Base present value
- 0.00
- Lowest tested present value
- 0.00
- Minimum funding headroom
- 125.00
Full LNG expansion - 2 Mtpa
Fails configured limits Breaches funding requirements.
- Base present value
- 99.06
- Lowest tested present value
- -62.19
- Minimum funding headroom
- -787.81
Partner-funded position - 0.4 Mtpa sponsor share
Fails configured limits Exceeds the unsecured-receivables limit.
- Base present value
- 35.28
- Lowest tested present value
- 27.33
- Minimum funding headroom
- 57.55
Partner position with USD 20m bank credit support
Preferred, conditional Approval remains subject to the stated conditions.
- Base present value
- 34.49
- Lowest tested present value
- 26.53
- Minimum funding headroom
- 57.34
| Alternative | Base NPV | Worst tested NPV | Minimum funding headroom | Assessment |
|---|---|---|---|---|
| Retain current business | 0.00 | 0.00 | 125.00 | Within limits |
| Full LNG expansion - 2 Mtpa | 99.06 | −62.19 | −787.81 | Fails limits |
| Partner-funded position - 0.4 Mtpa sponsor share | 35.28 | 27.33 | 57.55 | Fails limits |
| Partner position with USD 20m bank credit support | 34.49 | 26.53 | 57.34 | Preferred, conditional |
Saved 2026-10-16T08:10:40.144Z · Results are retained as calculated; this page does not recalculate them.
How to read these results
NPV is net present value at the assumed 12% annual pre-tax hurdle over 66 months. Available funding headroom includes available cash and undrawn committed funding after the USD 25m minimum cash reserve. A negative value signals a funding shortfall.
Worst NPV and minimum headroom are the weakest outcomes across the configured scenarios and need not occur in the same scenario. Figures for options that fail funding are indicative: those paths cannot be executed as proposed without further support.
The first two runs did not make the later receivables finding a binding limit. The funding envelope and commitment fees also changed between runs 01 and 02; this explains why present values and funding headroom differ. Their historical recommendations remain visible. The third run includes that limit and is the final recommendation shown here.
CHALLENGE THE RECOMMENDATION
Six stresses.
Funding still available.
The final protected partnership retains positive funding headroom across all six specified stresses. The combined event creates the tightest point.
These are defined challenges, not calibrated probabilities. Lowest present value and lowest funding headroom need not occur in the same scenario.
Read the full public review ↓Lowest funding headroom by stress
USD million above the required reserve
Read the six stress definitions
CHALLENGE THE PROPOSAL
Six stresses, connected to the cash path.
Margin spike
JKM +USD 15 and Henry Hub +USD 5 for six months; margin receipts lag payments.
Spread squeeze
Two years of weaker trading spreads challenge the return from fixed commitments.
Terminal disruption
Reduced delivery capacity while committed supply and logistics costs continue.
Buyer default
Lost or delayed receipts expose the cash and credit consequences of customer failure.
Combined event
Concurrent shocks test whether the business can meet obligations under compound pressure.
Lost prepayments
Six months without prepayments and 30 extra days to collect customer cash.
These are defined challenges, not calibrated probabilities or a guarantee against every possible market event.
Inspect the commercial assumptions and pricing basis
WHAT WENT INTO THE CASE
Commercial inputs.
Dated cash.
Explicit limits.
All prices and terms below are assumptions for this demonstration. They are not live market quotations or executable offers.
Download the assumption register ↓- Contract period / valuation
- 5 years / 66 months, including final settlements
- Assumed delivered LNG price
- USD 11.25 per MMBtu
- Assumed supply price
- 115% × USD 4.25 Henry Hub + USD 3.00 toll per loaded MMBtu
- Partnership / sponsor economics
- 1 Mtpa gross / 40% sponsor share, equivalent to 0.4 Mtpa
- Final funding / reserve
- USD 50m cash + USD 100m committed revolver / USD 25m minimum cash
- Funding costs
- 6.5% annual borrowing; 0.5% annual fee on the committed line
- Setup capital / bank support
- USD 12m / USD 20m credit support at USD 200,000 a year
SEE THE DECISION DEVELOP
From the first question
to a conditional recommendation.
12 min 51 sec · Silent · English subtitles
Follow the configuration, the funding challenge and the credit correction. Historical calculations are retained; the reporting presentation is refreshed for this edition.
Configuration and saved calculations: 16 October 2026. Reporting presentation: 19 October 2026. English subtitles are visible in the picture. No audio narration. Complete working files remain private.
Explore all 42 configuration and decision steps
FROM BUSINESS QUESTION TO EXECUTIVE REVIEW
Inspect the full configuration journey.
42 steps / configuration, reasoning and saved results
STEP 01 / 42
Start from the saved decision library
We start a new hypothetical LNG business case. Existing saved decisions remain untouched. All figures in this demonstration are assumptions in US dollars.
Open full-size screenshot ↗
STEP 02 / 42
Choose a blank decision
A blank decision keeps the business question separate from existing trading books. We will compare no expansion, full ownership and a smaller partnership.
Open full-size screenshot ↗
STEP 03 / 42
Empty manual setup
We define the decision before importing any numbers. Business case is the correct decision type because this compares capital, contractual commitments and funding alternatives.
Open full-size screenshot ↗
STEP 04 / 42
Set the business question
We ask whether the proposed funding is enough under stress, not simply whether LNG trading is profitable. The accountable owner is the Head of Trading.
Open full-size screenshot ↗
STEP 05 / 42
Define valuation and limits
We use a 66-month horizon: five contract years plus final cash settlements. The assumed hurdle is 12% before tax. Setup capital is capped at $50m; the funding envelope is a separate cash constraint.
Open full-size screenshot ↗
STEP 06 / 42
Build the USD 600m funding envelope
The initial envelope is $100m opening cash plus a committed $500m revolver. Borrowing costs 6.5% a year and we preserve a $25m minimum cash reserve. Emergency group funding is excluded.
Open full-size screenshot ↗
STEP 07 / 42
Import the prepared cargo dataset
We bring in the prepared scenario inputs: 140 full-scale cargoes, 70 partnership cargoes, six stress paths, supply payments, vessel costs, terminal commitments and separate margin movements. These are assumed inputs for this demonstration.
Open full-size screenshot ↗
STEP 08 / 42
Imported inputs validated
PARALLEL validates the imported data before calculation. The cash schedule preserves each payment date and distinguishes trading costs, setup spending and refundable collateral.
Open full-size screenshot ↗
STEP 09 / 42
Keep evidence and assumptions distinct
Commercial prices and contract terms are explicitly hypothetical. Cheniere supports the fixed-toll plus Henry Hub structure; BIS supports testing hedge-related liquidity shocks. Neither source supplies a live quotation for this case.
Open full-size screenshot ↗
STEP 10 / 42
Review the three business resources
The resource list separates wholly owned trading, the sponsor share of the partnership, and the facility fee. Each alternative receives only its own cargo schedule, avoiding double-counted volumes or funding.
Open full-size screenshot ↗
STEP 11 / 42
Inspect full-scale commitments
The full option lifts 2 Mtpa: 28 cargoes each year. Four vessels support a 45-day round trip, using about 86% of available vessel-days. Setup costs $35m; supply tolls, charters and terminal fees remain payable during disruption.
Open full-size screenshot ↗
STEP 12 / 42
Inspect the margin stress path
The stress raises JKM by $15 and Henry Hub by $5 for six months. Short-JKM margin is posted first; the Henry Hub margin receipt arrives five days later. Collateral is cash tied up, not a trading expense.
Open full-size screenshot ↗
STEP 13 / 42
Inspect the partner structure
The partnership trades 1 Mtpa gross; our sponsor owns 40%, equivalent to 0.4 Mtpa. Two vessels serve the venture. Cash flows include only our share, with $12m setup cost and no assumed guarantee of the partner share.
Open full-size screenshot ↗
STEP 14 / 42
Challenge the customer prepayment assumption
Normally 90% of partner sales pass through supply and logistics costs, and customers prepay 70% of that contracted portion. We also test six months without prepayments and 30 days of extra collection delay.
Open full-size screenshot ↗
STEP 15 / 42
Allocate each alternative
The baseline adds no commitments. The full option owns all LNG economics. The partner option receives only its 40% share and requires enforceable limits on sponsor recourse. Both expansion options include the facility fee.
Open full-size screenshot ↗
STEP 16 / 42
Avoid double-counting the partner share
The partner cash schedule already contains the 40% sponsor economics. We allocate 100% of that prepared schedule, rather than applying 40% again. Rights remain unconfirmed because the terms are hypothetical.
Open full-size screenshot ↗
STEP 17 / 42
Review the complete stress set
We test a margin spike, a two-year spread squeeze, terminal disruption, buyer default, a combined event and lost customer prepayments. These are challenges to the proposal, not estimates of event probabilities.
Open full-size screenshot ↗
STEP 18 / 42
Check the selling price and units
The base delivered LNG benchmark is assumed at $11.25 per MMBtu. We distinguish delivered energy from loaded energy: 1.5% is lost through boil-off. Prices here describe the imported schedule; changing them requires rebuilding that schedule.
Open full-size screenshot ↗
STEP 19 / 42
Check indexed supply costs
Henry Hub is assumed at $4.25 per MMBtu. Supply costs 115% of Henry Hub plus a $3 fixed toll per loaded MMBtu. Keeping the purchase and selling benchmarks separate exposes basis and spread risk.
Open full-size screenshot ↗
STEP 20 / 42
Set the liquidity risk control
Funding is checked for the sponsor entity. It must pay its bills and preserve USD 25m cash without group rescue. The early-review trigger is USD 50m of available funding headroom: cash plus unused committed borrowing, less the minimum cash reserve.
Open full-size screenshot ↗
STEP 21 / 42
Validate before calculation
The configuration check tests dates, linked resources, required stress schedules and collateral reconciliation. It prevents missing or duplicated inputs; it does not turn assumed commercial terms into signed contracts.
Open full-size screenshot ↗
STEP 22 / 42
First saved result: profitability is not enough
The original USD 600m review shows USD 96.57m of base present value for full expansion. But its lowest available funding headroom is negative USD 352.03m. Positive value does not make this structure affordable under the specified stress.
Open full-size screenshot ↗
STEP 23 / 42
Compare all three alternatives
This saved review includes no expansion, full ownership and the partnership. We reject a higher apparent return when its funding limit fails. Value calculated after a cash breach is indicative because that path requires additional support.
Open full-size screenshot ↗
STEP 24 / 42
Find the first emergency-cash date
Full expansion first breaches its funding limit on 1 March 2027. Its largest shortfall is USD 352.03m in the combined stress, despite the USD 600m envelope. That is why the original structure is not recommended for approval.
Open full-size screenshot ↗
STEP 25 / 42
Preserve the first saved result
The first result remains a dated, separate saved record. A later report can change its presentation without replacing the underlying calculation. The public review presents selected evidence; complete calculations and schedules remain private.
Open full-size screenshot ↗
STEP 26 / 42
Create a smaller funding snapshot
We preserve the $600m result and change the working decision for a smaller board request. The new name clearly identifies the $150m partner funding review; the five-year cargo assumptions stay comparable.
Open full-size screenshot ↗
STEP 27 / 42
Configure a USD 150m partner envelope
The smaller request uses $50m of sponsor cash plus a $100m committed revolver. We keep the same $25m minimum cash reserve and 6.5% borrowing rate. The partner finances its own 60% share outside this sponsor account.
Open full-size screenshot ↗
STEP 28 / 42
Reprice the commitment fee
Reducing the facility also reduces its commitment fee. We replace the 66 monthly fee payments with $41,666.67 each: 0.50% a year on the $100m line. This prevents the revised case carrying the cost of the old $500m facility.
Open full-size screenshot ↗
STEP 29 / 42
Validate the revised funding case
The revised fee table is applied and the configuration passes again. Trading volumes, stress cash flows and hedge terms are unchanged. Only the sponsor funding package, its fees and the decision name have changed.
Open full-size screenshot ↗
STEP 30 / 42
The smaller case clears the funding test
The intermediate USD 150m funding case shows USD 35.28m base present value, USD 12m setup spending and USD 57.55m lowest available funding headroom. It passes the tested cash constraints, but the binding credit review is still to follow.
Open full-size screenshot ↗
STEP 31 / 42
Read the worst partner stress
In this intermediate run, the combined stress leaves USD 27.33m present value and USD 57.55m available funding headroom. Peak borrowing is USD 42.45m on the USD 100m revolver. This does not establish protection against every possible event.
Open full-size screenshot ↗
STEP 32 / 42
Trace cash rather than relying on a headline
Available funding headroom is not the cash balance. It includes unused committed borrowing after the required cash reserve. The dated cash checks keep receipts, payments, loan balances and refundable margin separate so that debt is not mistaken for profit.
Open full-size screenshot ↗
STEP 33 / 42
Keep the intermediate result separate
The intermediate funding result remains separate from the original USD 600m review. Its public summary is selected evidence, not a complete operating model. Internal assumptions, complete cash schedules and configuration files remain private.
Open full-size screenshot ↗
STEP 34 / 42
Separate funding from setup spending
An executive review separates economic value, setup spending and funding. The USD 150m envelope is USD 50m cash plus a USD 100m committed line. The USD 12m setup cost is a use of that funding, not an additional USD 150m investment.
Open full-size screenshot ↗
STEP 35 / 42
Explain what could still change the answer
The partnership relies on enforceable cost pass-through, customer prepayments, committed partner capital and limits on sponsor recourse. We test the loss of prepayments, but these protections still require commercial and legal confirmation before commitment.
Open full-size screenshot ↗
STEP 36 / 42
Keep both earlier results searchable
The library retains both the original $600m result and the smaller $150m cash review. A subsequent credit check found a further issue, so neither historical result will be overwritten.
Open full-size screenshot ↗
STEP 37 / 42
Bring in the separate credit findings
A separate invoice ledger check finds $39.50m peak partner receivables against a $25m limit. We import that binding limit and add a new option with $20m of eligible bank credit support at an assumed $200,000 annual fee.
Open full-size screenshot ↗
STEP 38 / 42
Make the credit limit binding
The $25m unsecured-receivables limit is now an explicit portfolio constraint, using the maximum across all supplied stresses. The unprotected partner case fails. Proposed $20m bank support reduces the protected exposure to $19.50m.
Open full-size screenshot ↗
STEP 39 / 42
Final recommendation after the credit check
The final credit-supported partnership is preferred. It shows USD 34.49m base present value and USD 57.34m lowest available funding headroom. The credit-support fee reduces value by about USD 0.79m; the unsecured partnership fails the credit limit.
Open full-size screenshot ↗
STEP 40 / 42
Final stress result and approval conditions
The final structure retains USD 26.53m present value in the combined stress and uses up to USD 42.66m of the USD 100m revolver. Credit support must be enforceable, bank-eligible and issued without sponsor cash collateral. These remain conditions to approval.
Open full-size screenshot ↗
STEP 41 / 42
Retain the full decision history
All three saved runs remain identifiable: the original USD 600m review, the USD 150m cash review and the final credit-supported recommendation. The revised answer is visible. The original inputs and results are not overwritten.
Open full-size screenshot ↗
STEP 42 / 42
The conditional approval request
Seek conditional approval for the USD 150m credit-supported partnership. The conditions are committed funding, partner capital, executable supply and logistics terms, enforceable cost recovery and eligible credit support. Change any of these and recalculate before commitment.
Open full-size screenshot ↗
CHECK THE EVIDENCE
Evidence you can challenge.
The original demonstration reconciled the calculation outputs to a separate checking implementation and tested invalid inputs, funding breaches, credit protection and saved-result reproduction. These recorded tests passed on 16 October 2026; they do not constitute independent external commercial validation.
View the 17 functional tests, expected results and actual outcomes
| Test | Expected result | Actual outcome | Result |
|---|---|---|---|
| Change a stress without updating its cash schedule | Reject incomplete update | Reject incomplete update | Pass |
| Omit a required stress schedule | Reject incomplete configuration | Reject incomplete configuration | Pass |
| Release margin that was never deposited | Reject fictitious cash release | Reject fictitious cash release | Pass |
| Start with borrowing above the committed line | Reject borrowing above the line | Reject borrowing above the line | Pass |
| Provide two no-expansion baselines | Reject ambiguous baseline | Reject ambiguous baseline | Pass |
| Enter the same setup spending twice | Reject duplicated spending | Reject duplicated spending | Pass |
| Offer higher NPV but insufficient cash | Prefer the smaller partnership | Prefer the smaller partnership | Pass |
| Calculate the no-expansion baseline | USD 0 incremental NPV | USD 0 incremental NPV | Pass |
| Calculate the final credit-supported case | Prefer the credit-supported partnership | Prefer the credit-supported partnership | Pass |
| Offer the unsecured partner case with higher NPV | Reject: unsecured credit limit breached | Reject: unsecured credit limit breached | Pass |
| Test the protected case against all configured limits | Pass configured limits | Pass configured limits | Pass |
| Remove eligibility of bank credit support | Recommend retaining the current business | Recommend retaining the current business | Pass |
| Reduce the revolver to USD 40m | Recommend retaining the current business | Recommend retaining the current business | Pass |
| Recalculate the four final alternative values | Reproduce all four saved NPVs to the cent | Reproduce all four saved NPVs to the cent | Pass |
| Charge the annual credit-support fee | Five annual charges, once per contract year | Five annual charges, once per contract year | Pass |
| Treat bank protection as additional cash | No additional cash recovery credited | No additional cash recovery credited | Pass |
| Test maximum protected receivables against USD 25m | Pass: USD 19.50m, below USD 25m | Pass: USD 19.50m, below USD 25m | Pass |
The downloadable summary covers all 17 recorded functional tests in business language. Complete calculation schedules and regression evidence are retained privately for scoped evaluation. These historical checks have not been rerun for this publication update.
BEFORE A COMMITMENT
The recommendation has conditions.
The preferred option clears the specified model limits. It still requires evidence that the proposed structure can be delivered.
- Contracts that can be executed. Confirm matched supply, shipping and terminal rights, deliverability and the assumed commercial terms.
- Funding that is committed. Confirm the revolver, the partner’s 60% capital contribution and enforceable limits on sponsor recourse.
- Credit support that qualifies. Secure eligible USD 20m bank protection at the assumed fee, without sponsor cash collateral.
- A fresh decision if terms change. Replace assumptions with approved inputs and recalculate before signing.
Read all 20 conditions retained with the final result
- Hypothetical demonstration: all commercial figures assumed in USD. No client validation, executable terms or calibrated event probabilities.
- Pre-tax NPV at assumed 12% hurdle; tax domicile, legal covenants and post-tax equity returns require a separate mandate.
- No emergency group cash included. Partnership succeeds only if 60% partner funding, pass-through, prepayment and capped recourse are enforceable.
- Credit and delivery require invoice-level evidence. A cash-only view does not establish delivery performance or credit clearance.
- Collateral is excluded from profit but included in cash and financing interest. No terminal franchise value or cash beyond contractual runoff assumed.
- The final review makes the largest stressed unsecured receivables exposure a binding limit, using a separate invoice reconstruction. Bank support remains proposed, not issued.
- Execute matched supply, charter and terminal terms; confirm deliverability and sanctions screening.
- Obtain committed financing and collateral/netting legal opinions before signing five-year obligations.
- Replace assumed quotes and pre-tax hurdle with approved prices, tax basis and board risk limits.
- Execute non-recourse partner structure, committed 60% partner funding and prepayment rights; reject uncapped sponsor guarantees.
- Obtain enforceable USD 20m eligible bank credit support, confirmed 1% fee and no sponsor cash collateral. If unavailable, do not commit: both unprotected expansion routes breach the credit limit.
- Confirm rights and executable terms for Partner position with USD 20m bank credit support
- Exploration uses reference data or authored assumptions. Replace and reconcile material inputs before a business commitment.
- Review invoice timing and delivery obligations alongside cash results. Full supporting schedules are retained privately for controlled evaluation.
- Deterministic authored stress paths, not calibrated probabilities or executable quotes.
- Daily closing cash may understate intraday liquidity; gross margin call and five-day settlement mismatch explicitly stressed.
- Pre-tax, no optional cargo optimisation, legal netting or quantitative vessel routing assurance.
- Conservative commitment fee on the entire committed facility at 0.50% per year, paid monthly for the full 66-month horizon. Borrowing interest is calculated separately each day by PARALLEL.
- No bank-protection recovery benefit is counted in cash or NPV. Protection reduces unsecured receivables exposure, with eligible issuing-bank exposure capped separately at USD 20m.
- Supplied commercial cash schedules are assessed as prepared. Changes to prices, contract terms or stresses require refreshed schedules and a new calculation; untested outcomes are not inferred.
TAKE THE EVIDENCE WITH YOU
An executive view.
A reviewable case.
The public Executive Leadership Report brings the recommendation, visual comparisons, assumptions and decision history together.
Use the supporting tables to challenge the findings. The cash extract is illustrative and incomplete; it cannot reproduce the model.
Full configurations, complete cash schedules and internal validation files remain private. No client information is included in this hypothetical example.
YOUR NEXT CONSEQUENTIAL DECISION
Bring the decision.
We will work through the evidence.
Start with your business question, decision date and the options under consideration. A scoped Decision Case engagement can take agreed inputs through to a reviewable recommendation.